Singapore Changi invites proposals for multiple retail/F&B units

By Kevin Rozario |

Image Credit: Shawn/Unsplash
Singapore Changi Airport, retail, F&B

Several mixed-size, retail and F&B units are available at SIN.

Singapore Changi Airport (SIN) is looking for contract partners for a series of mixed-size retail and food and beverage (F&B) units, with the tenancies starting from January to April next year for varying lengths of time. The biggest, in Terminal 3, covers more than 1,600sq m over three levels.

SIN’s operator, Changi Airport Group (CAG), is inviting interested companies via a ‘direct marketing exercise’ which is not an open tender. This type of selection process is used for specific categories such as cafés, kiosks, fast food, or speciality restaurants, where CAG hand‑picks the winner.

The largest of the concessions is across four open-category locations covering retail and F&B at the soon-to-be-constructed, threelevel lifestyle concept development at Terminal 3. The units are as follows:

Concession A: Arrival Meeting Hall North, Level 1, T3 (622sq m)

Concession B: Departure/Check-in Hall North, Level 2, T3 (561sq m)

Concession C: Level 3, T3 (390sq m)

Concession D: A single flagship tenant taking up three levels of the development, T3 (1,657sq m).

In reference to this group, CAG stated: “We are looking for concepts that will enhance, add value, and differentiate the retail as well as F&B offerings at the airport in T3.” Concessions with a cumulative total floor area of >600sqm and above will run for 5 years, from either 1 October 2027 or the date of commencement of operations of the premises as notified by CAG, whichever is later. Concessions with footprints <600 sq m will be for 3.5 years from 1 October 2027 under the same terms. Both have renewal options.

Other Changi concessions available

The rest of the open concessions are for 3.5 years, with mixed start dates as follows:

– a local/Asian café at Basement Level 2 South (#B2-07), T3 (177sq m), starting 1 February 2027 and non-renewable at the end of the term

a café kiosk at the Arrival Meeting Hall East, Level 1 (#01-K23), T1 (45sq m), starting 22 January 2027 and non-renewable at the end of the term

– a brand-name speciality restaurant at Hub & Spoke 2, Level 1, T2 (114sq m) starting 1 April 2027

a brand-name speciality restaurant at Hub & Spoke 2, Level 1, T2 (225sq m) starting 1 April 2027

a brand-name speciality restaurant at Hub & Spoke 2, Level 1, T2 (876sq m) starting 1 April 2027.

While most of the above invitations to propose are from this year, one dates back to October 2025. Others not listed here date back even further but remain open and available. For full details on all the above (plus older concessions), and for the relevant email contacts at CAG, click here.

READ NEXT: Bellygom lands at Changi Airport with large-scale activation

READ NEXT: The Shilla Duty Free unveils Lunar New Year retail campaign at Changi Airport

Asia & Pacific

Mondelēz WTR debuts Toblerone Strawberry Matcha at Singapore Changi

Image Credit: Mondelēz WTR Mondelēz World Travel Retail (WTR) has partnered with Changi...

Europe

ON LOCATION: Frankfurt’s art‑led Terminal 3 opens with big retail and F&B push

Image Credit: Fraport Frankfurt Airport’s new Terminal 3 was officially opened today,...

Europe

Heathrow Airport revenue up but outlook uncertain in Q1 update

Image Credit: Heathrow Airport London Heathrow has reported overall revenue of £844 million...

image description

In the Magazine

TRBusiness Magazine is free to access. Read the latest issue now.

E-mail this link to a friend